Vehicle crossings:permit. pour. passed.
A vehicle crossing is built on council land, to council spec, under council inspection. We've spent ten years pouring exactly this kind of work for Melbourne councils — so when we build yours, the permit, the drawings and the inspections are routine, not a research project.
What's included
- Council permit application, layout plans and consent fees managed
- Demolition and removal of the old crossing (and redundant kerb laybacks)
- Excavation, boxing, reinforcement to your council's standard drawings
- Pre-pour council inspection booked and passed before concrete arrives
- Pour and finish — plain grey, charcoal or coloured concrete
- Kerb & channel reinstatement, footpath tie-ins, spoon drains where required
- Final council inspection and clean site handover
Recent crossings & kerb work
Crossover questions, answered
What exactly is a vehicle crossing?
It's the section of driveway between your property line and the road — over the nature strip, footpath and kerb. It sits on council land, which is why it needs a council permit and has to be built to the council's own specification, not just poured like a normal driveway.
Do I really need a permit?
Yes — for a new crossing, a replacement, a widening, or removing one. Every Melbourne council requires it, and most inspect the formwork before the pour and the finished job after. Skip the permit and council can make you rip it out at your cost.
Who deals with the council?
We do. The application, the layout plan, our insurance certificates, booking the pre-pour and final inspections — that's all part of the job. You'll only hear from us, not the council.
How much does a crossover cost?
It depends on size, whether an old crossing needs demolishing, the finish, and your council's fees — most single crossovers in Melbourne land somewhere in the low-to-mid thousands all-in. Text us a photo of the frontage and the address and we'll give you a real number, free.
How long does it take?
The concrete work itself is typically 1–2 days plus curing time. The council permit adds lead time that varies by council — some issue in days, some take a few weeks. We tell you the realistic timeline for your council up front.
Can you match my existing driveway?
Yes — plain grey, charcoal and coloured concrete, broom or trowel finishes, and set-in bluestone where councils like Boroondara require it.
Crossover rules where you live
Glen Eira
Vehicle Crossing Permit
Permit info →Bayside
Vehicle Crossing Permit
Permit info →Hobsons Bay
Vehicle Crossing Permit
Permit info →Merri-bek
Vehicle Crossing Permit
Permit info →Brimbank
Vehicle Crossing Application + Consent (two-stage)
Permit info →Melton
Works within Road Reserve consent
Permit info →Whittlesea
Works in Road Reserve Permit
Permit info →Boroondara
Vehicle Crossing Permit (3-stage)
Permit info →Banyule
Vehicle Crossing Permit / Works Within Road Reserve
Permit info →Darebin
Vehicle Crossing Permit (two-step)
Permit info →Get your crossover quoted
Call or text a photo of the job and a rough address — you'll get a straight answer on price and timing.
Prefer email? vincentmasci@icloud.com





