Glen Eira City Council

Vehicle crossingsin Glen Eira.

Thinking about a new or replacement crossover in Glen Eira? Here's what council requires — and every bit of it is something we handle for you as part of the job.

The rules

What Glen Eira requires

PermitVehicle Crossing Permit
Suburbs we coverCaulfield · Caulfield North · Caulfield South · Elsternwick · Bentleigh · Bentleigh East · McKinnon · Ormond · Carnegie · Murrumbeena · Glen Huntly
Requirements
  • Permit required to construct, modify, repair or remove a vehicle crossing or the adjacent footpath — lodged through council's ePathway portal, normally processed within 10 working days.
  • Application needs a plan of the crossing showing width and offsets to council and public assets (trees, pits, cables, pipes), plus written approval from any authority with assets near the crossing.
  • Heritage Overlay properties and 16 listed arterial roads (Centre Rd, North Rd, Nepean Hwy and others) need a planning permit before the crossing permit can be granted.
  • Council inspects the proposed location before approval and inspects the finished crossing and footpath; work follows council's standard drawing STD-401.
  • Only one single-width crossing per single-dwelling frontage; shared crossings need the neighbour's signature; redundant crossings must be removed and the kerb and nature strip reinstated.
Council feesApplication $400 (non-refundable), as published July 2026.
Worth knowingStreet trees on the nature strip can only be moved by council itself, via a paid application — we flag any tree conflict at quote stage. Crossings built without a permit can be ordered to be torn out, so the paperwork matters here.
Official infoGlen Eira City Council — vehicle crossing information ↗

Details checked against Glen Eira City Council's published information, July 2026. Councils adjust fees and processes (usually each July) — we confirm current requirements with council on every job, and council fees are itemised in your quote.

How we handle it

You make one call. We do the rest.

  • Permit application prepared and lodged with Glen Eira
  • Site plans, insurance certificates and traffic management supplied
  • Pre-pour and final inspections booked around council lead times
  • Built to Glen Eira's standard drawings and specification
  • Old crossing demolished and kerb reinstated where required
Free quotes, straight answers

Crossover in Glen Eira? Get it quoted.

Call or text a photo of the job and a rough address — you'll get a straight answer on price and timing.

0423 691 622

Prefer email? vincentmasci@icloud.com

☎ Call✎ Text✉ Email